D4.5 Manufacturing of Test Bench and 5 TPER Modules - Executive Summary
This deliverable demonstrates the manufacturing, assembling, and testing of the test bench and the 5 TPER modules for testing at TRL4. The Test bench basic design, i.e. PFD and control system, was carried out by HST, while EUT carried out the design and assembly of the test bench. The 5 TPER modules were designed, manufactured, and assembled by HST. HST then installed and commissioned the reactor at EUT premises. POLITO and HZB participated in the installation and commissioning of this TRL4 prototype.